Evaluation of the data

Evaluation of the data

The knowledge of the Fortuna tunnel through the scans proved to be valuable… The systematic of the procedure for the construction of the historical mine “Weisser Stein” in fact points to some significant analogies. If these data had been missing, it would...
Test drilling according to plan

Test drilling according to plan

Based on a graphical representation of the measurement results, a drilling plan was drawn up together with Klaus Löcker from Prof. Neubauer’s team, the implementation of which should lead to clarification of “the underground conditions”. Volker...
Covid 19 and the Depot

Covid 19 and the Depot

In 2021, the pandemic in both the USA and Europe determined the further course and provided the realisation that the final stage of the project could not be realised with American partners. However, an article in the daily newspaper Berliner Zeitung and in the Saxon...