What we did
Clearing the measuring surfaces
First stage of the project work in 2019 It is not the case that you can simply drive over the forest floor with the georadar equipment and measure the subsoil....
Visit from the USA
In May 2019, a film crew from Los Angeles visited Deutschkatharinenberg on behalf of the Discovery TV network. Prof. Dr. Wolfgang Neubauer was interviewed about...
The measurement work
In order to study the methodology of the earlier mine operators, laser scanning was necessary in the Fortuna adit, from which copper, tin and silver had been...
Film crew Artrejo in action
It's good to work with professionals, and if the collaboration is also a pleasure, all the better. Stephan Schmidt's career speaks for itself. Trained as a...
People’s Consortium Waldviertel
For 2020, the pandemic was crucial. A contract with the TV network History fell through with Covid 19. The turbulence at History ensured that other funding had to...
Serious research
Prof. Dr. Wolfgang Neubauer has been Director of the Ludwig Boltzmann Institute for Archaeological Prospection and Virtual Archaeology since 2010 and teaches at...
Evaluation of the data
The knowledge of the Fortuna tunnel through the scans proved to be valuable… The systematic of the procedure for the construction of the historical mine "Weisser...
Test drilling according to plan
Based on a graphical representation of the measurement results, a drilling plan was drawn up together with Klaus Löcker from Prof. Neubauer's team, the...
Covid 19 and the Depot
In 2021, the pandemic in both the USA and Europe determined the further course and provided the realisation that the final stage of the project could not be...